Smiths Lane
  • Home
  • Design Guidelines
  • Title Updates
  • Lot Details
  • Application
  • Contact
Account

Customise your experience

What best describes you?

Covenant Application

Design Assessment Form

Please ensure that you have read all the information prior to submitting the application. Both the builder and the owner will be updated on the progress of the application via the email addresses provided below.
  • Already Submitted an application? Log In
  • Owners details

    Owners email address will be used for communication and updates on the application
  • Builders details

  • Will be used for communication and updates on the application
  • House/Structure Details

  • Name/description of house/facade design
  • Front of Lot Landscaping

    Refer to landscaping e-brochure for indicative designs and plant species.

    View Landscaping Brochure

  • Note: we do not customize gardens on request. The installation is in accordance with the style chosen, species’ availability & suitability at time of installation and the geometry of your lot.
  • Pre-works must be completed to accommodate an irrigation system:

    • A 90 mm PVC pipe or similar is required to be installed under the driveway setback at a minimum of one (1) metre from the front boundary. A minimum of two external taps are to be installed, one in the rear yard and one in the front yard on the side of the dwelling adjacent to the side gate/fence.
    • An external power point must be installed adjacent to the external tap located in the front yard
    • Front Path Treatment:
      • The front garden package does not include a front garden path.
      • The installation of a path is the responsibility of the owner should you choose to do one.
      • The path must be installed prior to receiving the Front Lot Landscaping Package.

    General Construction Items:

    • Driveway complete
    • All required earthworks complete and landscape area levelled to 100mm below driveway level in preparation for top soil
    • Retaining walls complete (if applicable) and in accordance with the Design Guidelines. (If batter is to be used, it should not be more than 1:6 gradient - consult your builder or architect).
    • All site rubbish removed
    • Garage door installed
    • Porch and front paths (if applicable) complete
    • Rear, side and return fencing installed (Mirvac will install the front lot fencing as part of the package)
    • Approved letterbox installed
    • Drainage infrastructure installed (as required)
    • NBN Co. street connection completed
    • Clear access to area in which works will be undertaken
  • Document Submission

    Provide all documents. If any are not provided, it will delay your process.
    Tick off each document as you upload it below
  • Drop files here or
    Accepted file types: pdf, doc, docx, txt, jpg, gif, png, zip, eml, msg.
  • Drop files here or
    Accepted file types: pdf, doc, docx, txt, jpg, gif, png, zip, eml, msg.
  • Drop files here or
    Accepted file types: pdf, doc, docx, txt, jpg, gif, png, zip, eml, msg.
  • Drop files here or
    Accepted file types: pdf, doc, docx, txt, jpg, gif, png, zip, eml, msg.
  • Please include any notes / additional information
  • Acknowledgement